• C&PAClements & Porter Architects
  • Projects
  • News
  • About
  • All
  • Construction
  • Events
  • Planning

1st May 2023 — Construction

Structure completed at Commercial Road

The serviced apartments at Commercial Road have now reached 5th floor level. The concrete frame and steel structure on the top floor has been completed, ready to begin adding exterior walls.

C&PA are continuing to work to deliver the detailed design information ahead of the construction programme.

Photo from street level showing concrete and steel structure finished

Clements & Porter Architects
63 Rivington Street
London EC2A 3QQ

+44 (0)20 7739 5799
info@clementsporter.co.uk

Instagram | LinkedIn

Privacy Policy

RIBA Chartered Practice Logo
ARB Logo